World Wide Web ASDpower  
 
 
 
   
 

ASD is committed to building lasting client relationships by providing consistently superior services.
Here is a list of some ASD's clientele. Each has received one of our services, products or studies.

Client

Location

Product

In Operation

USA:

Universities: Georgia Tech University - Neetrach Atlanta, GA High Voltage Power Source Design & Control 2007
University Of North Carolina Charlotte, NC Load Cycle Test System 2014
    
Utilities:
Georgia Power Atlanta, GA Recloser Voltage Test System 2013
Fully Automated 1 phase Transformer Loss Test System - TLS-100 2013
- Upgrade three phase test system
- Partial Discharge & Diagnostics System -PD2
2006-2007
Gulf Power Pensacola, Fl 1 phase Transformer Loss Test System - TLS-100 2012
Upgrade Hipotronics Three Phase Test System TLS-300 2008
Progress Energy Raleigh, NC Maintenance of Test equipment 2010
Xcel Energy Denver, Co 3 phase Transformer Loss Test System - TLS-300 since 2005
Baltimore Gas & Electric Baltimore, MA Maintenance of Test equipment 2003
Alabama Power Calera-Alabama  Partial Discharge & Diagnostics System - PD2 since 2006
Upgrade Biddle Three Phase Test System - TLS-300

2008

 
Municipality

Utilities:

Johnson City Power Board Johnson City 1 phase Transformer Loss Test System - TLS-100 since 2001
City of Concord Concord, NC  Upgrade Biddle Three Phase Test system - TLS-300 since 2002
Public Works Commission Fayetteville, NC  Upgrade Biddle Three Phase Test system - TLS-300 since 2002
Wilson Utilities Wilson, NC 1 phase Transformer Loss Test System - TLS-100 since 2004
Gainesville Regional Utilities Gainesville, Fl 3 phase Transformer Loss Test System - TLS300 2013
Greenville Utilities Greenville, NC 1 phase Transformer Loss Test System - TLS-100 since 2005
Marietta Power Georgia, GA 1 phase Transformer Loss Test System - TLS-100 since 2006
Kansas City Power & Light Kansas, MO  Upgrade Biddle Three Phase Test System -TLS-300 2014
Upgrade Multi-amps test system to TLS-100 since 2005
Jacksonville Electric Authority

Jacksonville ,Florida

3 phase Transformer Loss Test System - TLS-300 2011
Johnsoncity Power Board Johnson City, TN Substation Inspection & Maintenance Software-SIM2 since 2006
Oxford Oxford, AL Substation Inspection & Maintenance Software-SIM2 since 2007
Appalachian Electric Georgia, GA Substation Inspection & Maintenance Software-SIM2 since 2007
Athens Athens, TN Substation Inspection & Maintenance Software-SIM2 since 2009
Oak Ridge Electric Oak Ridge, TN Substation Inspection & Maintenance Software-SIM2 since 2009
Florence Florence, AL Substation Inspection & Maintenance Software-SIM2 since 2009
Murfreesboro Murfreesboro, TN Substation Inspection & Maintenance Software-SIM2 since 2009
Humboldt Humboldt, TN Substation Inspection & Maintenance Software-SIM2 since 2009
Memphiscity Memphiscity, TN Substation Inspection & Maintenance Software-SIM2 since 2009
Leniorcity Leniorcity, TN Substation Inspection & Maintenance Software-SIM2 since 2009
Newport Newport , WA Substation Inspection & Maintenance Software-SIM2 since 2009
 
Manufacture:
Siemens Richland, MO Automated 3 phase Transformer Loss Test System (including Heat run Test) 2012-2013
Aluma-Form Memphis, TN Automated Connector Test System 2013
Cooper Power systems Nacogdoches, TX Haefely Impulse generator up-grade 2011
TE Connectivity-TYCO Fuquay, Varina, NC Load Cycle Test System 2012
Automated Arrester Test System 2011
Hi Pot Test System 2011
Automated Connector Test System 2010
SGB Denver, CO Automated Three Phase Transformer Test System (including Upgrades, Heat Run Test) 2010
ABB Jefferson City, MO Heating & Drying System - I2R 2007-2008
General Cables Duquoin, Illinois Upgrade PD Measurement System 2007
Pirelli Energy Division Abbeville, SC Design, install test floor for underground HV cable 2004

International:

China light & Power  (CLP) Hong Kong- China Fully Automated 3 phase Transformer Loss Test System - TLS300 2015
Delta Transformer Monterrey - Mexico Upgrade Biddle Three Phase Test system 2014
TE Connectivity-TYCO Juraze - Mexico Automated Arrester Test System 2011
Raycap S.A. Drama - Greece Automated Arrester Test System since 2006
Measurement International Canada Consulting, design Diagnostics equipment 2001
UNDP/MEW - United Nations Lebanon Energy Audit 2003 - 2006
PowerServ Antalya -Turkey Energy Audit 2005
Saudi Electric Company (SECO) Khobar-KSA 3 phase Transformer Loss Test System - TLS300 2008
CEPALCO Cagayan de Oro- Philippines 1 phase Transformer Loss Test System - TLS-100 2009
   
  2014 ASD. All rights reserved Designed and Developed by ASD